Facilities
We ensure rigorous safety management throughout the entire transportation process of cargo, from loading to unloading, using state-of-the-art facilities.
Auxiliary Facilities Status
-
01 Pipeline
Installed inlet / outlet pipes for each tank to prevent contamination and loss
-
02 Pump
Install tank-specific pumps to prevent contamination
-
03 Warming/Cooling Facilities
- To maintain cargo temperature, 24-hour steam or electric heating can be operated.
- A cooling system capable of maintaining the temperature of storage tanks at low levels ( freezing capacity of 98.51RT for 2 units and 28.26RT for 1 unit).
-
04 Firefighting facilities
- 2 units of 250 kW main pumps
- 3 units of standby pumps
- 1 unit of 30 kW auxiliary pump
- 1 unit of 500-ton fire water tank
- 1 unit of 7,000-liter foam tank + 1 unit of 1,000-liter foam tank (installed for each tank with a 3% aqueous alcohol film-forming foam solution)
-
05 Truck Scale
50 M/T Truck scale
-
06 N2 equipment
Installed 10 tons of liquid nitrogen tank and 1,500㎥/h carburetor, Nitrogen Blanketing in Storage Tanks
-
07 Air Pollution Control Facilities
A/C Tower, Vent Gas Combustion Unit 2 units
-
08 Automatic Measurement System
By continuously monitoring the temperature and level of storage tanks in real-time and implementing HIGH & LOW alarms, we enable real-time monitoring of tank conditions and ensure safe cargo management
Shipping Support
- 01Shipment facilities that can ship 8 tank lorries simultaneously
- 02Notification of quantity through SMS service when input / output the product
- 03Operation of input / output system for 24 hours, 365 days
- 04Worked as a professional worker in shipment and installed surveillance camera